What ground sample distance do you need to vectorize building footprints?

If you've been asked to sign off on an imagery contract for a building footprint program, the GSD question comes up before the budget does. Too coarse and your polygons turn into blobs. Too fine and you're paying for resolution the extraction process can't use anyway.
The short answer: for most national-scale footprint work, 0.5m or better is where corner geometry starts to hold up. Below that, you're extrapolating shapes rather than tracing them.
Why GSD sets the floor for polygon tracing
A building footprint is a shape with corners, and corners are where resolution gets tested hardest. At 1m GSD, a detached garage or a jogged exterior wall collapses into a handful of pixels, and the extraction process has to guess where the actual vertex sits. At 0.5m, most residential and commercial structures resolve with enough edge definition to trace a polygon that roughly matches the roofline. Push to 0.3m and you start picking up detail that matters for some use cases, like dormers, rooftop equipment, or additions that don't align with the main structure, but for a base layer meant to answer "is there a building here, and roughly what shape is it," 0.5m is doing most of the work already.
This is also why open datasets built from mixed-resolution sources are hard to standardize. A county that flew 0.3m orthos produces tighter footprints than a neighboring county working off 1m satellite tiles, and when you mosaic those together the geometry quality shifts at the boundary. A single VHR source flown or tasked at a consistent sub-meter resolution avoids that seam.
Where sub-0.5m imagery still falls short
Resolution alone doesn't solve footprint extraction. A few things 0.5m RGB imagery won't give you, regardless of how clean the pixels are:
Sheds, carports, and small ancillary structures under roughly 15-20 square meters sit right at the edge of what's resolvable, and whether they get captured consistently depends on contrast against the surrounding ground cover as much as GSD.
Shadow and canopy occlusion don't go away with finer pixels. A building half-covered by a mature tree canopy is still half-covered at 0.3m; you need either a different capture angle or a different season, not just more resolution.
Off-nadir distortion on tall structures can shift the apparent footprint away from the true ground-level outline no matter how sharp the imagery is. Near-nadir VHR capture matters here as much as the stated GSD.
Matching resolution to update cadence
The other variable buyers tend to underweight is how often the source imagery actually refreshes. A one-time 0.15m capture gives you gorgeous footprints for a dataset that's stale within two years, which is the same problem as the open-data patchwork you were trying to get away from, just with better edges. For a base layer other teams build addressing, parcel, and assessment logic on top of, a consistent ≤0.5m VHR source captured on a predictable annual cycle tends to beat an occasional ultra-high-resolution flyover that nobody budgets to repeat.
That's the tradeoff worth putting in front of procurement: chasing resolution past roughly 0.5m buys you detail most downstream footprint uses don't need, while skipping the annual refresh buys you a dataset that drifts out of date with every permit, demolition, and new build the agency never sees.
If you're scoping a national footprint layer and want to see how a building footprint base layer holds up against your own AOI, that's a conversation worth having before the next flight is tasked.